Meanwhile, the Pasighat-Pangin road (NH-13) is blocked at 36.200 km and the PMY road (NH-513) blocked at 14.700 Km
Men and machinery have been mobilised at ground zero to clear off the rubble covering the BRO road, to allow the passing of the vehicles, stuck due to the landslides.
The situation seems to worsen as rain continue to pound the state, blocking surface communication in strategic points.