Assam: 31 coal trucks from Margherita's Tikak Colliery stranded at West Bengal check post since November 1
Thirty-one coal trucks from Tikak Colliery have remained stranded during border verification. The delay has increased costs and raised concerns over pending and fresh dispatches.

- Buyers and transporters face mounting uncertainty and additional detention costs
- Fresh November tenders cover 11 railway rakes and 3,000 tonnes
- Up to 14,000 tonnes already await road dispatch at Tikak
Thirty-one coal-laden trucks carrying consignments procured through spot e-auction from Tikak Colliery of North Eastern Coalfields (NEC), Coal India Limited, in Margherita, have remained stranded at the Barobisa check post in West Bengal since November 1, triggering concerns among coal buyers and transporters over delays in inter-state movement.
According to stakeholders, the trucks were held up amid verification checks at the border, leaving buyers and transporters facing uncertainty and additional costs.
The delay has raised concerns over dispatch operations at Tikak Colliery, particularly as NEC Margherita has floated fresh tenders for November allocations. These include 11 railway rakes and 3,000 tonnes of coal for road transportation.
Industry stakeholders said around 13,000 to 14,000 tonnes of coal were already awaiting road dispatch at Tikak Colliery when the fresh tenders were issued. They warned that continued delays in inter-state verification could affect the clearance of existing stocks and the execution of new supply commitments.
The prolonged detention of the trucks has also tied up vehicles, drivers and buyers' capital in consignments that were procured through e-auction.
This correspondent attempted to contact Sanjay Bawri, Area Sales Manager of NEC Margherita, for clarification on the verification issue and the dispatch outlook, but the attempts were unsuccessful.
Coal traders in Margherita have urged the Assam and West Bengal governments to intervene and resolve the recurring check-post bottlenecks, saying smooth movement across the corridor is essential to prevent delays and congestion at Tikak Colliery.
Copyright©2026 Living Media India Limited. For reprint rights: Syndications Today









