Meghalaya: Work begins on first-ever Electric Vehicle Charging Station

Meghalaya: Work begins on first-ever Electric Vehicle Charging Station

Advertisement
Meghalaya: Work begins on first-ever Electric Vehicle Charging StationImage for representation

SHILLONG: Power Grid Corporation of India Limited (POWERGRID) has laid the foundation stone for first-ever Electric Vehicle Charging Station (EVCS) in the state of Meghalaya at its office complex yesterday at Lapalang, Shillong.

The EVCS is being developed under Faster Adoption and Manufacturing of (Hybrid) & Electric Vehicles (FAME) India Scheme Phase-II.

Under this scheme, POWERGRID shall be developing 11 EVCS in Shillong city (5 Public EVCS and 6 at government establishments). Each station shall have four 15 kW DC-001 Chargers and one 100 kW CCS-2/CHAdeMO Charger (dual gun) making it 66 charging points in Shillong city.

Out of the 11 locations, a Memorandum of Understanding (MoU) has been signed for 4 locations which include POWERGRID Office Complex at Lapalang, MTC Ware House at Demthring, MTC Parking Lot at Police Bazar, and Polo Parking Lot at Polo.

POWERGRID has developed itself as one of the market leaders in the EVCS business and has its presence in major cities of India like Hyderabad, Ahmedabad, Delhi, Bengaluru, Gurugram, and Kochi.

POWERGRID has presently 172,154 ckm of transmission lines, 262 Sub-stations, and more than 446,940 MVA of transformation capacity. With the adoption of the latest technological tools and techniques, enhanced use of automation and digital solutions, POWERGRID has been able to maintain average transmission system availability >99%.

Follow us on Facebook

Edited By: Admin
Published On: Sep 05, 2021
POST A COMMENT